By practicing a design philosophy that stressed flexibility, the EAI team was able to partner with the client to create a truly unique, but replicable system ... Continue Reading
Case Study: Data Center Complex
Under the threat of shutdown for excessive sewer discharge and in need water and cost savings, a large data center complex turns to EAI for the ... Continue Reading
Case Study: Kaiser Permanente – Harbor City, CA
Kaiser Permanent Harbor implements TDS-reducing technology in cooling tower make-up water to save water, save energy, lower chemical usage, and preserve ... Continue Reading
Case Study: Reuse of Cooling Tower Blowdown At Commercial And Municipal Buildings
Covering over 520,000 square feet, the San Jose McEnery Convention Center is the largest convention center in Silicon Valley. In keeping with the City of San ... Continue Reading
Case Study: UC Irvine Cooling Tower Water Reuse Innovation
The University of California - Irvine, with an enrollment of over 35,000 students, has long dedicated itself to sustainability efforts throughout the daily ... Continue Reading